Construction of an industrial concrete floor at the Nestle plant, Smolyhove village, Volyn region.

Nestle Plant 1

The subbase is prepared before concrete pouring.

Nestle Plant 2

The planned and compacted subbase is ready for industrial flooring installation.

Nestle Plant 3

A double spatial reinforcement mesh is tied according to the project design.

Nestle Plant 4

Concrete pouring is performed using laser levels, with constant level monitoring.

Nestle Plant 5

Control joints in the slabs are designed to induce cracking in concrete at predetermined locations.

Nestle Plant 6

Over several weeks, the floor cures and develops its natural color.

Nestle Plant 7

Industrial floors with a hardened topping can operate for decades.