TWINTEC Industrial Floors
Project: Cold storage facility at Fornetti-Ukraine plant, Chernihiv region
Area: 532 m2
Structure: multi-layered floor with heating and insulation, reinforced topping layer.
Concrete: grade B30 P4, reinforced with steel fiber
Topping: Refloor RF1
Varnish: Refloor Siler



